Company introduction :Jiangsu Xingxing Drying Equipment Co., Ltd
WORKING PRINCIPLE
the air, after being heated and purified, is immited from the bottom by induced draft fan and passed through the screen plate of hopper. In the workshop, fluidization is formed through mixing and negative pressure. the moisture is evaporated and removed fast, thus the materials can achieve rapid drying.
FEATURES
1. Fluidized bed is designed in round structure to avoid dead ends.
2. in the bed there is stirrer. It avoids agglomeration of damp material and forming channel flow during drying.
3. It uses tipping unit to discharge granule, which is convenient, fast and thorough. It can also design automatic feeding and discharging system as required.
4. Sealed negative-pressure operation. Air filtered. Easy operation and cleaning.
5. Fast drying speed and uniform drying temperature. Drying time is generally 20-30 minutes for each batch, depending on the material.
APPLICABLE MATERIALS
this dryer is widely used for the following materials:
1. Mechanism screw extrusion particles, rock particles, high-speed mixed granulation particles.
2. Drying of wet granules and powdered materials in medicine, food, forage, chemical and other fields
3. Large particles, small lumps, sticky granular and lump materials.
4. Materials whose volume will change after drying such as konjak.
Parameter
Item |
Model |
Feeding capacity(kg) |
60 |
100 |
120 |
150 |
200 |
300 |
500 |
Power of fan(kw) |
7.5 |
11 |
15 |
18.5 |
22 |
30 |
45 |
Power of stirring(kw) |
0.55 |
1.1 |
1.1 |
1.1 |
1.1 |
1.5 |
2.2 |
Revolution of stirring(rpm) |
8~11 |
Steam consume(kg/h) |
141 |
170 |
170 |
240 |
282 |
366 |
451 |
Operate time(min) |
15-30(It depends on the nature of materials) |
Main machine heigh |
2700 |
2900 |
2900 |
2900 |
2900 |
3300 |
3500 |
Company introduction: Jiangsu Xingxing Drying Equipment Co., Ltd.
Jiangsu Xingxing Drying Equipment Co.,Ltd has established in 1998 and it covers an area of 15000 square meters, possesses fixed asset of USD 7 million. The products have exported to US, Singapore, India, Ukraine, Russia, Korea and so on. The company have advanced production equipment , excellent technical team and after-sales service.
CERTIFICATE
Package:wooden case
Service:
pre-sale service
We Invite customers to visit our company and communicate on technical requirements face to face.
sale service
Responsible for debugging the equipment according to customers' requirements of various technical data. Our engineers will train our customers about equipment features and operation key points to make sure the equipment running in the best condition.
after-sale service
We provide installation, debugging, maintenance, training and other services; Provide relevant technical data, equipment, software and related GMP certification materials;Set up after-sales service hotline, and arrange personnel to visit customers every year to know more customer needs,like customer operation problems in the process of production equipment.
quality promise
Our company promises strictly operate the ISO9001 quality system certification standards and pharmaceutical equipment GMP audit requirements,promise we provide new equipment. Advanced technology,good quality.Equipment operation safe reliable, affordable, easy to maintain.
Equipment warranty period is one year,all the parts for the equipment choose well-known brand.
During the warranty when equipment have problem in quality like equipment failure and damage,the company for free maintenance or replacement.
We look forward to cooperating with partners from all over the world to build win-win cooperation relationship in long term. Welcome for your visiting.
Previous Exhibition
FAQ:
1. Q: Please describe your warranty period.
A: 15 months after the equipment is arrived at the destination port or 12 months after the installation and commissioning of the equipment, whichever comes first.
2. Q: Do you provide on-site installation and commissioning?
A: Yes, we do. If on request, we'll provide the guidance of on-site installation and commissioning. Usually one mechanical engineer and one electrical engineer to assist.
3. Q: How about the cost of on-site installation and commissioning guidance?
A: The cost consists of round-trip air tickets, room and board expenses, service cost (labor cost), and site transportation (or directly provided by client), which shall be paid additionally.
4. Q: Are you a factory or a trading company?
A: We are a professional manufacturer. We have own factory and pilot plant for customers to do sample testing.